ARCADIS GMI provides audit services in the
following areas:
Environmental Aspect Identification and
Significance Determination
An environmental review of an
organisation’s or facility’s activities
environmental effects and legal
requirements, to establish its significant
environmental aspects. Includes the
determination of significance criteria if
required.
Internal Audits
Internal environmental audits of an
organisation’s / facility’s Environmental
Management System (EMS), in support of a
client’s internal audit team. We are also
able to provide audit training for
in-house personnel.
Pre-certification Audit or "Gap Analysis"
Reviews compliance with the requirements
of ISO 14001, prior to an external
certification audit. Identifies and makes
recommendations for the correction of:
-
any "major"
non-compliances against ISO 14001, which
would prevent a successful certification
audit, including principal areas of
regulatory non-compliance.
-
Principal
"minor" non-compliances which could, in
sufficient numbers in the same element
of the EMS or in the same area of an
organisation, prevent a successful
certification audit.
Compliance Assurance
Establishes the legal requirements
applicable to an organisation or facility
and the extent to which it is complying
with them. May also include the evaluation
of compliance with other environmental
requirements, such as corporate policy and
customer specifications. Subsequent work
can be undertaken to correct any
non-compliances identified.
Pre-Aquisition Audit
An assessment of the
environmental liabilities (past, present
and future) of an organisation or facility
prior to merger or acquisition. The scope
and depth of pre-acquisition audits can
vary significantly. Typical topics
include: legal compliance, land and
groundwater contamination, and future
liabilities
Environmental Risk Assessment
A review of physical
environmental risks and (usually) the
operational controls used to manage them,
to identify areas for improvement.
Subsequent work can be undertaken to
reduce or eliminate risks through
engineering works or changes in
operational control